A technology of concrete shear walls and heat-insulating concrete, which is applied to walls, building components, buildings, etc., can solve the problems of many processes, high cost, and a service life shorter than 15 years, so as to achieve precise control of the construction period and improve construction quality Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] An installation process of a composite thermal insulation concrete shear wall, comprising the following steps:
[0046] 1) see figure 2 , eject the wall axis 2 on the wall foundation 1;
[0047] 2) see image 3 , measure and release the position of the prefabricated component 9 of the concrete shear wall: mark the corresponding prefabricated component position 3 on the foundation beam 1, and set positioning pins 4 at intervals on the edge of the prefabricated component; place a positioning pin (Ф1cm* at intervals of 20cm 5cm).
[0048] 3) see Figure 4 1. Leveling: set a leveling layer 7 at both ends of the prefabricated component; use high-grade cement mortar for leveling, and the local area of the leveling layer at the lower part of each slab rib is about 6cm*10cm2. Height 1cm.
[0049] 4) set up inner scaffolding 18 on the inner side of body of wall;
[0050] 5) Set up an outer scaffold 18 on the outside of the body of wall;
[0051] 6) see Figure 5 , ins...