Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for manufacturing high strength and large specification wire rope sling

A production method and steel wire rope technology are applied to bridge parts, erection/assembly of bridges, bridges, etc., which can solve problems such as inability to meet structural and force requirements, and achieve the effects of saving materials and reducing costs

Active Publication Date: 2009-12-23
SHANGHAI PUJIANG CABLE +1
View PDF0 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] High-strength and large-size wire rope slings (60, 80, 88) were successfully used in the Xihoumen Bridge for the first time in China. A series of problems, the length of the long sling of this bridge reaches 340m, the conventional sling length error requirements cannot meet the structural and force requirements, when the sling assembly length is ≤200m, the distance between the marking points is required to be 1 / 5000 The total length of the cable is required to be 1 / 3000; when the total length of the sling is ≥ 200m, the distance between the marking points is required to be 1 / 8500, and the total length of the finished sling is required to be 1 / 5000

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0034] The manufacturing method of the high-strength and large-size steel wire rope sling of this embodiment comprises the following steps:

[0035] 1. Check the raw material. Confirm that there are no broken wires or rust on the wire rope.

[0036] 2. Matching length. According to the length of the stretching groove in the workshop and the matching of long and short cable lengths, the matching length is optimized, and a certain length is made to facilitate pre-tensioning, while saving materials and reducing the cost of the bridge.

[0037] 3. Make temporary anchors. In order to ensure the progress of pre-tensioning, temporary anchorage should be made.

[0038] 4. Pre-tensioning to control the inelastic deformation of the wire rope. After the temporary anchoring, the two ends are connected with the pre-tensioning equipment with tool cables, and the steel wire ropes are connected and subjected to five-stage loading, and the measurement data in them are strictly calculated. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a manufacturing method in the technical field of bridge engineering, in particular to a method for manufacturing a high strength and large specification wire rope sling. The method comprises the following steps: (1) checking raw materials, and ensuring that a wire rope has no broken wire, no rust and the like; (2) according to the length of a workshop tensioning groove, performing optimal length matching on a long cable and a short cable to be matched into a certain length; (3) manufacturing a temporary anchorage device to ensure performing pretension; (4) performing pretension to control the inelastic deformation of the wire rope; (5) resisting corrosion; (6) cutting off a mark; (7) performing anchor manufacturing on the wire rope, and passing the wire rope into a buffer before anchor manufacturing; (8) casting an ingot by using a special conical ingot mould, and preheating the mould; and (9) performing tensioning retest on the sling according to a length matching table. The method can be applied to bridges; and according to the length of the workshop tensioning groove, the long cable and the short cable are matched to perform optimal length matching to be matched into a certain length, so that the method is favorable for performing pretension, saving materials simultaneously and reducing the bridge cost.

Description

technical field [0001] The invention relates to a manufacturing method in the technical field of bridge engineering, in particular to a manufacturing method of high-strength and large-size steel wire rope slings. Background technique [0002] High-strength and large-size steel wire rope slings (60, 80, 88) were successfully used in Xihoumen Bridge for the first time in China. There were a series of problems in the production process of high-strength and large-size steel wire rope slings. The error requirements for the length of the sling cannot meet the structural and force requirements. When the length of the sling is ≤ 200m, the distance between the marking points is required to be 1 / 5000, and the total length of the finished sling is 1 / 3000; the length of the sling is ≥ 200m , the distance between the marking points is required to be 1 / 8500, and the total length of the finished sling is required to be 1 / 5000. In order to ensure its practical application, its production m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D19/16E01D21/00
Inventor 李刚罗国强张海良谢飞崔恒峰
Owner SHANGHAI PUJIANG CABLE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products