Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!
Construction method of V-level surrounding rock tunnel
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A technology for tunnel construction and surrounding rock, which is applied in tunnels, tunnel linings, earthwork drilling and mining, etc. It can solve problems such as easy landslides, pilot pit collapse, unfavorable small conduits, etc., and achieve the effect of speeding up the construction progress
Inactive Publication Date: 2011-04-27
CHINA RAILWAY NO 9 GRP
View PDF0 Cites 2 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0002] In the past, when constructing V-level and V-level weak surrounding rock tunnels, the double-side-wall pilot pit method was adopted. This method made the end of the leading small conduit in an unfavorable cantilever state, which easily formed a landslide, causing the upper part of the pilot pit to collapse. It is not conducive to the function of small conduits, the construction footage is slow, the construction efficiency is low, and it is not conducive to passing through weak surrounding rock areas
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
specific Embodiment approach
[0060] Specific implementation method: V level surrounding rock tunnel construction method, its steps are as follows:
[0061] The construction method of V-level surrounding rock tunnel, the steps are as follows:
[0062] 1) Construction of drill-guided I-beam steel arch:
[0063] (1) Enlarge the excavation contour line by 30cm, install three I-steel arches on the arch, the angle between the two ends of the I-steel arches is 120°, and the distance between the I-steel arches is 0.3m / a. And install the channel steel joist at the arch foot of the I-steel arch frame, the channel steel joist is welded on the arch foot of the I-steel steel arch frame, and construct the concrete foundation at the arch foot of each I-steel steel arch frame, The foundation adopts 10cm thick C25 concrete;
[0064] (2) Construction of I-shaped steel arch frame locking foot anchor rods: two locking foot anchor rods are drilled for each arch foot of I-shaped steel steel arch frame. The angle is 20° hori...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention relates to a construction method of a V-level surrounding rock tunnel, comprising the following steps: (1) making a drill guiding I-beam steel lagging jack, i.e. mounting an I-beam steel lagging jack, a groove steel trimming beam, a lock pin anchor rod, a guiding steel pipe, a longitudinal connection steel rib and face injecting concrete in sequence; and (2) construction and supportin the tunnel, i.e. drilling pipe shelter steel pipe holes, mounting pipe shelter steel pipes, filling slurry inwards. The earthwork construction of a pilot tunnel comprises earthwork construction, primary support, injecting concrete on a pilot tunnel wall, suspending steel bar nets, casting concrete basis, mounting I-beam steel lagging jack, groove steel trimming beam, steel pads, I-shaped steelinclined strut and lock pin anchor rods, welding longitudinal connection steel bar, injecting concrete on the face and removing core soils; mounting a first-level step temporary inverted arch comprises: constructing lower-level earthwork, performing primary support in the pivot tunnel, mounting the second-level step temporary inverted arch, constructing the following level of earthwork, performing primary support, casting and filling inverted arch, and casting lining concrete at a time inside the pivot tunnel. The invention has the advantage of rapid penetration speed and safe construction.
Description
Technical field: [0001] The invention creates a method related to the construction of V-level and V-level weak surrounding rock tunnels. Background technique: [0002] In the past, when constructing V-level and V-level weak surrounding rock tunnels, the double-side-wall pilot pit method was adopted. This method made the end of the leading small conduit in an unfavorable cantilever state, which easily formed a landslide, causing the upper part of the pilot pit to collapse. It is not conducive to the function of small conduits, the construction footage is slow, the construction efficiency is low, and it is not conducive to passing through weak surrounding rock areas. Invention content: [0003] The purpose of the present invention is to provide a construction method for V-level surrounding rock tunnels with fast footage, safe construction, reasonable stress on the support structure, and a V-level surrounding rock tunnel that can pass through weak surrounding rock sections; t...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.