Soil anchor quick construction method and anchor thereof

A construction method and bolt technology, applied in excavation, foundation structure engineering, sheet pile walls, etc., can solve the problems of construction difficulties, reduced reliability and stability, high cost, etc., and achieve the effect of shortening the construction period and reliable production

Inactive Publication Date: 2010-07-07
郑鸿彰
View PDF0 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0017] 1. It is difficult to collect the pullout force of each soil layer directly, and the cost is quite high;
[0018] 2. Through drilling, that is, indirect production of steel bars or steel hinge wire bolts, you must wait for a long time. Adding some early-strength agents to make them early-strength will make the heat of hydration too concentrated, making them The inner slurry, water, soil layer, etc. all suddenly heat up and expand greatly, and then shrink due to cooling after hydration, thus weakening the pullout resistance of the formed anchor rod and reducing its reliability and stability

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Soil anchor quick construction method and anchor thereof
  • Soil anchor quick construction method and anchor thereof
  • Soil anchor quick construction method and anchor thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] Below in conjunction with the preferred embodiment shown in accompanying drawing, be described in further detail:

[0043] In the accompanying drawings of the present invention, figure 2 Reference numerals 21, 23, 24, and 25 in the figure are respectively plastic pipes, anchor clamps, anchor tendons, and grouting anchor rods.

[0044] In all drawings, Lf is the free segment, and Lm is the anchor segment.

[0045] image 3 Reference numeral 31 in is the soil layer.

[0046] Figure 4 The reference numerals 42, 43, 44 in are steel bars, steel strands, and center lines respectively, while the reference numeral 41 may be a steel pipe.

[0047] Figure 5 Reference numeral 51 in is the top end of the anchor rod steel pipe.

[0048] The technical problem to be solved by the present invention is to avoid the disadvantages of the above-mentioned prior art and propose a bolt and its rapid construction method.

[0049] Such as figure 1 As shown, it is basically the same a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an anchor quick construction method using steel tube as the anchor bar. The method includes that a hole is prepared in the soil and the jointed steel tube is inserted into the hole; grout is injected through the steel tube hole and stopped when overflowing the anchor hole or the predetermined position; a waist beam is spanned or the anchor is locked firmly on the waist beam by nuts after short time maintenance. With the method of the invention, the anchor bar is tensioned in resistance of drawing after satisfying the corresponding conditions, thereby the time waiting for the anchor bar construction in the side slopes and foundation ditches supporting process is greatly shortened and the construction period is also shortened.

Description

technical field [0001] The invention relates to a construction method in building engineering side slope or foundation pit support, and more specifically relates to a soil layer anchor rod and a rapid construction method thereof. Background technique [0002] The names of soil anchors and rock anchors are similar, but their core purposes and functions are very different. The soil anchors provide pullout resistance for foundation pit or slope support, mostly in the horizontal direction. When the rock formation is relatively complete, it will Stable and safe, so the rock bolt is mainly used to strengthen the cracks, broken zones and weak layers in the rock formation by grouting, so as to realize the stability of the rock mass itself. Appropriately bear the corresponding load, especially the main purpose of the hollow bolt in the rock mass layer is to realize its grouting reinforcement. It is the same bolt, the purpose and function of the soil layer and the rock body are very d...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/76E02D5/74E02D17/20E02D17/04
Inventor 郑鸿彰
Owner 郑鸿彰
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products