Construction technology of steel sheet pile cofferdam for Yellow River Channel internal support table construction

A technology of steel sheet pile cofferdam and construction technology, which is applied to sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of cumbersome construction procedures, long construction period, and large investment in manpower and material resources, and achieve safe and reliable construction. The effect of low cost and convenient construction

Active Publication Date: 2010-09-22
CHINA RAILWAY 20 BUREAU GRP +3
View PDF4 Cites 47 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When the existing construction methods of pier caps in water are used for construction, the bored piles at the bottom of the caps are usually constructed first, and then the construction of the caps and the upper piers of the caps is completed on the top of the completed bored piles. Therefore, there are many defects and deficiencies such as long construction period, cumbersome construction procedures, and large investment in manpower and material resources.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction technology of steel sheet pile cofferdam for Yellow River Channel internal support table construction
  • Construction technology of steel sheet pile cofferdam for Yellow River Channel internal support table construction
  • Construction technology of steel sheet pile cofferdam for Yellow River Channel internal support table construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0049] Such as figure 1 Shown is a steel sheet pile cofferdam construction process for the construction of caps in the Yellow River channel. The caps to be constructed are water caps 1 located in the main channel of the Yellow River. The process includes the following steps:

[0050] Step 1. According to the structure, size and bottom elevation of the submerged platform 1 to be constructed, combined with the geological and hydrological conditions of the river bed at the construction site and the work space to be reserved during cofferdam construction, determine the cofferdam used for the construction of the submerged platform 1 2, the cofferdam 2 is surrounded by a plurality of steel sheet piles 3 closely connected in sequence; then, according to the determined structure and size of the cofferdam 2, determine the size of the single sheet pile 3 used for the construction of the cofferdam 2 Quantity, size and model.

[0051] In this embodiment, the cross-sectional shape of the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction technology of a steel sheet pile cofferdam for Yellow River Channel internal support table construction. A construction support table is an underwater support table arranged in a Yellow River Channel. The technology comprises the following steps of firstly, determining a structure and the size of a used cofferdam in the process of underwater support table construction; secondly, surveying and setting out; thirdly, constructing the cofferdam; fourthly, constructing a bored pile at the bottom of the support table; fifthly, constructing the support table: carrying out forming construction of the underwater support table on the top of the bored pile after construction when the bored pile construction is finished, and finishing integrative construction of the bored pile and the underwater support table; and sixthly, constructing a pier column at the upper part of the support table. The invention has the advantages of reasonable design, convenient construction and low construction cost, carrys out construction by adopting an integrative construction method of the support table and the bored pile and can efficiently solve the defects of long construction period, large investment, needs of setting up a plurality of construction platforms, large construction difficulty and the like in the successive construction process of the bored pile and the support table in the traditional construction process of the steel sheet pile cofferdam.

Description

technical field [0001] The invention belongs to the technical field of cap platform construction in the Yellow River channel, and in particular relates to a steel sheet pile cofferdam construction process for the cap platform construction in the Yellow River channel. Background technique [0002] With the rapid growth of my country's economy and the continuous increase of national infrastructure, the strategy of "replacing ships with bridges" will be implemented-all pontoon bridges on the Yellow River will be replaced by the Yellow River Bridge. However, in the middle and upper reaches of the Yellow River in my country, there is a flood season in the Yellow River, and the floodplain area is very large. The design scheme of the steel sheet pile cofferdam and the underwater foundation cleaning method can be applied to the construction of the bridge in the middle and upper reaches of the Yellow River. [0003] The Baotou City Stengkou Yellow River Bridge is 6355m long and is lo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D19/04E02D5/04E02D27/14
Inventor 刘建新杜越张永民赵选利王永丽张照龙
Owner CHINA RAILWAY 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products