Graded dispensing system of gravel for anti-leakage wall and preparation method thereof
A technology of anti-seepage wall and gravel-mixed silo, which is applied in the preparation system and field of gravel-mixed material for anti-seepage wall, which can solve the problems such as difficult to complete the one-time processing and preparation of gravel-mixed material, so as to shorten the production cycle and reduce the site occupation , the effect of improving production efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] Such as figure 1 , figure 2 Among them, a system for preparing gravel materials for cut-off walls, the primary crushing workshop is connected with the primary screening workshop through the first belt conveyor 131, and the primary screening workshop is connected with the secondary primary crushing workshop through the second belt conveyor 132 on the sieve Connection, the secondary coarse crushing workshop is connected with the first tape machine 131;
[0025] The primary screening workshop is connected to the secondary screening workshop 11 through the fourth belt conveyor 134 and / or the ninth belt conveyor 139 under the screen, and the secondary screening workshop 11 is connected to the intermediate crushing workshop through the fifth belt conveyor 135. The intermediate crushing workshop The sixth tape machine 136 is connected with the fourth tape machine 134, the secondary screening workshop is connected with the finished gravel bin through the seventh tape machine ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 