Vacuum brazing process of plasma cutting electrode
A cutting electrode and brazing process technology, applied in the field of material welding, can solve the problems of high price of pure silver cooling jacket, complex structure of plasma cutting electrode assembly, complicated operation, etc., and achieves simplified vacuum brazing process, simple structure and surface. good quality effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] according to figure 1 First, assemble the oxygen-free copper sleeve 1, the silver-copper eutectic solder wire 2 (2.5mm in diameter, 2.0mm in height), and the hafnium wire 3 according to the assembly gap of 0.05mm, and then add Upper positioning copper ring 4, then use the lower push rod 5 located at the center of the positioning copper ring 4 to withstand the hafnium wire 3 and the upper ejector rod 6 located at the center of the axis of the copper sleeve seat 1 to press the copper sleeve seat 1, and place it at the bottom for Fixture 7 in the horizontal plane.
[0033] Place the assembly in a vacuum furnace and evacuate to 8×10 -3 Pa.
[0034] First heat at 20°C / min to 400°C and hold for 20 minutes; then heat at 10°C / min to 750°C and hold for 60 minutes; then heat at 20°C / min to 840°C and hold for 30 minutes.
[0035] After cooling out of the furnace, cut off the positioning part, and obtain a plasma cutting electrode with full joint filling, no solder flow phenomen...
Embodiment 2
[0038] according to figure 1 First, assemble the oxygen-free copper sleeve 1, the silver-copper eutectic solder wire 2 (2.5mm in diameter, 1.8mm in height), and the hafnium wire 3 according to the assembly gap of 0.03mm, and then add Upper positioning copper ring 4, then use the lower ejector rod 5 located at the center of the positioning copper ring 4 to withstand the hafnium wire 3 and the upper ejector rod 6 located at the center of the axis of the copper sleeve seat 1 to press the copper sleeve seat 1, and place it at the bottom for Fixture 7 in the horizontal plane.
[0039] Put the assembly into a vacuum furnace and evacuate to 1×10 -2 Pa.
[0040] First heat at 20°C / min to 400°C and hold for 20 minutes; then heat at 10°C / min to 750°C and hold for 60 minutes; then heat at 20°C / min to 830°C and hold for 40 minutes.
[0041] After cooling out of the furnace, cut off the positioning part, and obtain a plasma cutting electrode with full joint filling, no solder flow phenome...
PUM
| Property | Measurement | Unit |
|---|---|---|
| electrical resistivity | aaaaa | aaaaa |
| electrical resistivity | aaaaa | aaaaa |
| electrical resistivity | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 