Problems solved by technology

[0004] The invention provides a system and method for generating mine roadways, which are used to solve the defects of low efficiency and large errors in the manual drawing of the roadway on the excavation engineering plan in the prior art, which can improve the efficiency of drawing the roadway and reduce the error of the drawn roadway

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Mine laneway generation system and method
  • Mine laneway generation system and method
  • Mine laneway generation system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0026] Figure 1A A schematic structural diagram of the mine roadway generation system provided by Embodiment 1 of the present invention, as shown in Figure 1A As shown, the mine roadway generating system includes: a traverse point management module 11 , a central line management module 13 and a roadway management module 15 .

[0027] Wherein, the traverse point management module 11 is used to add required traverse points on the excavation engineering plan of the mine; save the measured information of the traverse points in the mine, and the measured information of the traverse points includes the position information and the traverse points of the traverse points. The parameter information of the roadway where it is located;

[0028] The central line management module 13 is used to generate the roadway centerline on the excavation engineering plan of the mine according to the position information of the traverse point imported from the traverse point management module or the ...

Embodiment 2

[0033] Figure 2A A schematic structural diagram of the mine roadway generation system provided by Embodiment 2 of the present invention, as shown in Figure 2A As shown, on the basis of the first embodiment, the central line management module 13 of the mine roadway generation system includes: an import drawing submodule 21 and / or an instruction drawing submodule 22 .

[0034] Wherein, the import drawing submodule 21 is used to generate the roadway centerline on the excavation engineering plan that needs to be drawn according to the position information of the traverse point that needs to be drawn imported by the traverse point management module;

[0035] The instruction drawing sub-module 22 is used to obtain the roadway centerline drawing instruction input by the user, and generate the roadway centerline on the excavation engineering plan that needs to be drawn according to the roadway centerline drawing instruction.

[0036] Further, the central line management module 13 m...

Embodiment 3

[0054] image 3 A schematic flow chart of the mine roadway generation method provided by Embodiment 3 of the present invention, as shown in image 3 As shown, the mine roadway generation method may include:

[0055] Step 101: Generate the roadway centerline on the excavation engineering plan that needs to be drawn according to the position information of the imported traverse point or the roadway centerline drawing instruction;

[0056] Wherein, step 101 can be realized in any of the following ways:

[0057] Mode 1, import the guide points of the roadway on the excavation engineering plan that needs to be drawn, and generate the roadway centerline on the excavation engineering plan that needs to be drawn according to the position information on the measured information of the guide points;

[0058] Method 2: Obtain the roadway centerline drawing instruction input by the user, and generate the roadway centerline on the excavation engineering plan that needs to be drawn accord...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a mine laneway generation system and a mine laneway generation method. The mine laneway generation system comprises a traverse point management module, a centerline management module and a laneway management module, wherein the traverse point management module is used for adding required traverse points on a mining engineering plan of a mine, and storing the measured information of traverse points in the mine; the centerline management module is used for generating laneway centerlines on the mining engineering plan of the mine according to the position information, imported by the traverse point management module, of the traverse points or an acquired laneway centerline drawing instruction; and the laneway management module is used for generating laneways accordingto selected laneway centerlines on the mining engineering plan and the parameter information of the laneways corresponding to the laneway centerlines; and laneway information corresponding to the laneway centerline comprises the input parameter information of the laneway or the parameter information of the laneway with the traverse points on the laneway centerline. By the system and the method, laneway drawing efficiency can be improved, and errors of the drawn laneway are reduced.

Description

technical field [0001] The embodiments of the present invention relate to the technical field of mine ventilation, and in particular to a mine roadway generation system and method. Background technique [0002] The mining engineering plan of a coal mine is the basic drawing that reflects the mine roadway layout and mining conditions. The roadway drawing on the excavation engineering plan in the prior art is drawn by a draftsman by manually spreading dots and connecting lines, and adding ink to cover words. The error of the roadway drawn on the excavation engineering plan drawn by hand reaches about 0.2mm. Because the manual drawing of roadways on the excavation engineering plan is very time-consuming and labor-intensive, usually once a month, it cannot fully reflect the current status of coal mine production and construction in a timely manner, and cannot meet the needs of the rapidly developing modern coal industry. [0003] To sum up, the current method of manually drawi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G06F17/50
Inventor 袁亮陈金龙王勇童桂郑是立杨清
Owner NAT ENG RES CENT FOR GAS CONTROLLING OF PINGAN MINE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products