Smooth starting method for electromagnetic/electromechanical transient hybrid simulation of large power grid
A hybrid simulation, electromagnetic transient technology, applied in the direction of electrical digital data processing, special data processing applications, instruments, etc., can solve the difference between the injected power grid, the large difference in the stable state of the first subnet and the second subnet, and the inability to establish Problems such as the initial stable state, to achieve the effect of promoting practical application, saving manpower and test investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The electromagnetic / electromechanical transient hybrid simulation flat start method of the large power grid proposed by the present invention comprises the following steps:
[0024] (1) At the sub-network interface of the large power grid, divide the large power grid into the first subnet and the second subnet, put the first subnet into the electromagnetic transient side of the hybrid simulation system, and put the second subnet into Electromechanical transient side of power grid hybrid simulation system;
[0025] (2) Establish the steady-state power flow model of the large power grid, and obtain the initial stable state of the large power grid through calculation, and use the initial stable state as the target stable state of the electromagnetic / electromechanical transient hybrid simulation;
[0026] (3) On the electromechanical transient side of the hybrid simulation, the power source is equivalent to the first subnetwork at the subnetwork interface; according to the ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


