Method for dewatering foundation pit by using bored cast-in-place pile
A technology of bored cast-in-place piles and foundation pits, which is applied in infrastructure engineering, construction, etc., can solve problems such as high cost, high noise, and difficult drilling, and achieve the goals of avoiding hole-forming noise, reducing construction costs, and reducing construction procedures Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The present invention is further elaborated below in conjunction with accompanying drawing. figure 1 Utilize the bored cast-in-place pile for the present invention to carry out the structural representation of the method for foundation pit dewatering, as figure 1 Shown, utilize bored cast-in-place pile of the present invention to carry out the method for foundation pit dewatering and comprise the following steps:
[0022] a) Excavate bored pile hole 9, the depth of pile hole 9 is over-excavated by 3-3.5m compared with the design depth; the over-excavation depth is mainly used for filling pea stone and fine sand in the subsequent steps; hoisting steel cage in pile hole 9 10. Fix the reinforcement cage 10 on the pile hole 9 with steel pipe or channel steel;
[0023] b) Lift the water filter pipe 6 welded with a steel plate at the bottom of the pipe and place it in the hole of the pile hole 9, wrap the filter screen on the wall of the water filter pipe 6, clamp the upper ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com