A concrete slab, prestressed technology, applied in sheet pile wall, construction, infrastructure engineering and other directions, can solve the problems of small contact surface of the connecting part, affecting the water-stop performance, and difficult alignment of the datum plane, so as to achieve easy construction, Guarantee construction quality and ensure the effect of water-stop performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Embodiment one: see figure 1 Shown, a kind of pretensioning method U-shaped prestressed concrete sheet pile sinking method comprises the following steps:
[0035] 1. Positioning and setting out
[0036] According to the measurement control points and design drawings provided by the construction unit, the position of the center line of the pile row is initially determined. After the trench is excavated, the center line of the pile row is accurately measured and calibrated, the steel purlin is erected, and each pile is determined according to the size of the sheet pile. At the central point, the construction can start after the construction unit and other relevant unit personnel review and inspect the line. Surveyors are required to record the center point and horizontal elevation of each pile position with a high degree of responsibility to ensure that the pile location is accurate and the pile top elevation basically meets the requirements. During the construction pro...
Embodiment 2
[0066] Embodiment 2: A road box culvert project with a total length of about 340.0m and a width of 6.0m. The soil layer distributed on the surface of the site is miscellaneous fill and silt in order, with a thickness of 0.7-1.3m; silty clay 1.0-2.3m; silty silty clay 2.1-5.3m; silty clay 3.3-3.7m; ~4.6m. The box culvert slope enclosure adopts pretensioned U-shaped prestressed concrete sheet piles.
[0067] The pretensioned U-shaped prestressed concrete sheet piles are constructed using the vibration method. The longest pile length is L=10m, passing through 3 layers of silty clay, and the piles are assisted by spiral soil extraction holes, which saves the construction period.
Embodiment 3
[0068] Embodiment 3: A retaining wall enclosure project, the soil layer distributed on the surface of the site is miscellaneous fill soil in sequence, with a thickness of 0.8-1.2m; clay 0.5-1.0m; silty clay 1.5-1.9m; silt 10.0-11.1m; Quality clay 1.7 ~ 4.6m. The length of the retaining wall enclosure is 770m. In the case of using the traditional support form, the enclosure body is a temporary structure, which will be discarded after the construction of the retaining wall. The current enclosure structure adopts pre-tensioned U-shaped prestressed concrete sheet piles. The "two walls in one" of the wall and the enclosure sheet pile shortens the construction period while saving the project cost.
[0069] The pretensioned U-shaped prestressed concrete sheet piles are constructed using the vibration method, the pile length L=11.3m, the pile ends are located in the silt soil layer, and the piles are sunk directly without auxiliary measures.