Integrated fast construction method for shield machine
A shield machine, fast technology, applied in earth-moving drilling, wellbore lining, tunnel lining and other directions, can solve the problems of poor continuity, high construction cost, water leakage, etc., and achieve the effect of reducing construction risk and shortening construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] refer to figure 1 , the present invention is a method for the integrated rapid construction of a shield machine, characterized in that it comprises the following steps:
[0018] 1) Install door curtain panels at the arrival construction site and the departure construction site respectively;
[0019] 2) Lay plain concrete between the opening curtain panels at the arrival construction site and the initial construction site;
[0020] 3) The shield machine passes through the portal to the construction site, and cuts the plain concrete until the shield machine reaches the starting construction site;
[0021] 4) Lay the segment at the plain concrete that has been cut between the arrival construction site and the initial construction site, and fill the bottom of the segment with double slurry to fix the segment.
[0022] In this rapid construction method, plain concrete is laid between the arrival construction site and the initial construction site, so that continuous excava...