[0023] From both sides of the river, start the construction of the access road, the temporary bridge and the island cofferdam of the cap at the same time, until the intersection in the middle to complete the construction of the access road, the temporary bridge and the island cofferdam of the cap. The beginning of the construction includes the steps: (a) from the side of the river 4, 5 in order to build the island of the first construction access road 2-1 and the first temporary bridge 3-1; (b) in the first The pile foundation of the first temporary bridge 3-1 is constructed on the island of Yibian Bridge 3-1. The pile foundation of the first temporary bridge 3-1 adopts the construction technology of underwater impact bored piles; (c) During the construction of the first temporary bridge 3 -1 pile foundation while filling the island of the first cap 1-1 on the side wall of the first construction access road 2-1, and construct the island of the first cap 1-1 Th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap