Pipeline laying method of long-distance coal conveying pipeline
A pipeline laying, long-distance technology, applied in the direction of pipeline laying and maintenance, pipe/pipe joint/pipe fittings, mechanical equipment, etc., can solve the problems of rough backfill, damage to the pipe wall, no strict control, etc., to reduce wear and tear, reduce The effect of maintenance costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] A pipeline laying method for long-distance pipeline coal transportation is to bury the pipeline underground so that the coal slurry can be safely and effectively transported to the destination through the pipeline. The pipeline laying method is carried out according to the following steps:
[0016] A. The pipeline is buried below the frozen depth line, and the soil covering depth from the top of the pipeline to the natural floor is ≥1.0m;
[0017] B. When laying pipelines in the gravel area, it is required to over-excavate 0.2m. The bottom of the ditch must first be laid with a 0.2m thick fine soil or fine sand cushion. Soil (sand) shall be backfilled to 0.3m above the top of the pipe, and then the original soil shall be used for backfilling. The maximum particle size of fine soil backfilling shall not be greater than 10mm, and the gravel of backfilling soil shall not be greater than 250mm;
[0018] C. Set up at least five emergency cut-off valves and valve chambers at ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com