BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model

A monitoring system, multi-level technology, applied in instruments, data processing applications, computing, etc., can solve the problems of unclassified storage and query, large modeling workload, large human, material and financial resources, etc., to reduce modeling workload, reduce Strength, the effect of improving productivity

Inactive Publication Date: 2013-12-11
RANKEN RAILWAY CONSTR GROUP
View PDF4 Cites 26 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the prior art, the data obtained by the construction safety information collection module is divided into real-time data in four dimensions: personnel, mechanical equipment, environment, and materials. There are the following deficiencies in storing and querying the four-dimensional data: through CAD modeling provides a visual platform for the construction process, the modelin

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] In order to enable those skilled in the art to better understand the technical solution of the present invention, the method and device for packaging and analyzing periodic scanning ultrasound data of the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.

[0019] Such as figure 1 Shown: a multi-level 4D model BIM risk monitoring system for subway construction risk monitoring, including: BIM server 3, the BIM server 3 is connected to the 4D model to collect risk information module 1, 4D model to collect construction progress information module 2 and System Schematic Module 4.

[0020] Among them, risk information mainly includes settlement value and risk value, because the main risk of subway underground excavation ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a BIM (Building Information Modeling) risk monitoring system and method of a multilayer 4D (4-Dimensional) model, which are used for monitoring a subway construction risk. The BIM risk monitoring system comprises a BIM server, wherein the BIM server is connected with a 4D model collecting risk information module, a 4D model collecting construction progress information module and a system schematic diagram module, wherein the system schematic diagram module comprises an engineering simulation drilling module and a system construction progress module. According to the BIM risk monitoring system and method, based on the BIM application of the construction, the problem that the BIM is only used as design assistant analysis is solved, the secondary utilization and secondary development of the BIM are realized, the creative application of the BIM in the construction field is started, the modeling workload is reduced by adopting the multilayer 4D model, and a home owner can use means such as a mobile device to check the progress condition of a project at any time on the basis of a web showing form through dynamic 4D risk monitoring and management of a tunnel construction progress and 4D visualization of construction process simulation.

Description

technical field [0001] The present invention relates to the technical field of construction process simulation and risk monitoring, specifically a BIM risk monitoring system and method that applies the BIM model to the multi-level 4D model of the subway construction site, and realizes the "reporting progress and other management information to the owner" anytime", "paperless". Background technique [0002] In view of the particularity of urban subway projects, which are concealed, huge, complex, and risk-concentrated in local areas, research on the safety and risk monitoring of subway projects will help to effectively reduce the impact of disasters and maximize the safety of people's lives and property. Promote sustainable urban development. The risk monitoring of subway projects must strengthen safety monitoring in the whole process from planning and design, construction to operation, among which the monitoring in the construction stage is the most important and the most d...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q50/08
Inventor 青舟刘海强董长明刘镜康登科郑文昌邹锦毅杨璐娉
Owner RANKEN RAILWAY CONSTR GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products