Field maintenance method for CRTSII slab-track track boards
A technology for on-site maintenance and slab track, which is applied in the direction of track, track laying, track maintenance, etc. It can solve problems such as difficult to untie, short maintenance skylight, and short time for CRTSⅡ slab track
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0027] The on-site maintenance method for a CRTS II slab track track slab described in this embodiment includes the following steps:
[0028] 1) Determine the damaged track slab, plant and anchor the intact track slab on both sides of the damaged track slab;
[0029] 2) After the intact track slabs on both sides of the damaged track slab are planted and anchored to strength, unlock the tension lock between the damaged track slab and the intact track slabs on both sides or / and between the two damaged track slabs;
[0030] 3) Repair the damaged track slab or / and between the track slabs;
[0031] 4) After repairing the damaged track slab or / and between the track slabs, restore the track slab to its original state by tensioning the lock;
[0032] 5) Plant reinforcement and anchor on the repaired damaged track slab;
[0033] 6) Finely ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com