An inclined vertical well drilling rig
A technology for inclined vertical wells and drilling rigs, which is applied in the direction of drill pipes, drill pipes, drilling equipment, etc., to achieve the effects of simplifying the overall structure, reducing strength, and reducing failure rates
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Embodiment 1: Taking a deviated vertical well drilling rig as an example, the present invention will be described in further detail.
[0045] see figure 1 , 2 , the inclined vertical well drilling rig includes a base (2), a derrick (4), a lifting device (5), a power head (6), a gripper (9), a centralizer (7), a torque tong (8), and a drilling tool conveying device (13) and other parts. The derrick is respectively connected with the base (2) through the rotating pin shaft, the swing liquid cylinder (1), the upper support (3), the lower support (12), the lifting device (5) is installed on the inside of the derrick (4), and the power head (6 ) is installed on the derrick, and is connected with the hoisting device (5) through reamed hole bolts, the clamper (9) is installed on the lower end of the derrick, the torque clamp (8) is installed on the inner side of the lower part of the derrick, the centralizer (7) and the derrick Bolt connection, the drilling tool delivery de...
Embodiment 2
[0063] Embodiment 2, taking the pre-drilling installation of the inclined vertical well drilling rig, the process of connecting single rods and removing single rods as an example, further introduces in detail, in order to deeply understand the inclined vertical drilling rig.
[0064] Installation before drilling:
[0065] After the drilling rig is in place, install the upper derrick. According to the designed drilling angle, select a suitable position for the pin hole of the support rod, fix the sliding sleeve with the support rod through the pin, and then connect the two upper supports with the derrick. The hydraulic cylinder slowly lifts the derrick to a suitable working position, connects the upper support with the hinge pin of the base, adjusts the adjustment screw of the lower support, and makes contact between the shoe cover and the meniscus support of the base; installs the connecting rod of the drilling tool conveying device, Position and install the drilling tool conv...
Embodiment 3
[0070] Example 3 illustrates the advantages of inclined vertical well drilling rigs in the development of coalbed methane with a specific example of well layout.
[0071] Taking a standard well site of 60 meters by 60 meters as an example, the depth of the coal seam is about 500 meters, the distance between the wellhead of each well is about 15 meters, and the horizontal distance between the bottom of the well is 250-300 meters. The derrick of the drilling rig is inclined at an angle of 33 degrees, and the wells are arranged in a circular form at the edge of the well site, and 8 inclined vertical wells are drilled. The inclination angle of the drilling rig is changed to 11 degrees, and the distance between the wellheads is guaranteed to be 15 meters. Drill 7 more wells in the inner circle of the well site. Such a well pad can accommodate 15 inclined vertical wells.
[0072] For conventional vertical wells, one well is arranged in one well pad, and 15 wells require 15 well pads...