Method and steel pipe support for construction of arch tower of inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge

A construction method and technology of steel pipe support, applied in cable-stayed bridges, bridges, bridge parts and other directions, can solve the problems of large load, large span, affecting construction quality, etc.

Active Publication Date: 2014-03-26
CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD +1
View PDF3 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For this form of arch tower, due to the inclination of the tower column, large span and large load, its stress stability along the bridge direction must be considered. However, the construction method for non-inclined reinforced concrete arch towers in the prior art cannot guarantee Its stress stability along the direction of the bridge will greatly affect the construction progress and even affect the construction quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and steel pipe support for construction of arch tower of inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge
  • Method and steel pipe support for construction of arch tower of inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge
  • Method and steel pipe support for construction of arch tower of inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] see figure 1 , the present embodiment is aimed at the prestressed concrete cable-stayed bridge with oblique arch towers and double cable planes. The centerline of the arch tower columns is inclined 12° along the bridge direction, the arch tower cross bridge direction is arched, and the height of the tower columns reaches 67.597m.

[0030] In this embodiment, the main tower 21 is vertically divided into multiple construction sections according to the construction formwork and the main tower line shape. For the main tower body, the hydraulic climbing formwork and the cable-stayed hanging construction are combined, and the hydraulic climbing formwork is used to bear the construction sections. The construction load of the section concrete, and the construction load is transmitted to the tower column below the construction section; the vertical load of the tower body is transmitted to the main tower cap 20 by the tower body itself, and the horizontal force generated by the to...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method and steel pipe support for construction of an arch tower of an inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge. The method is characterized by comprising the steps that a main tower is vertically divided into a plurality of constructed sections according to the line shape of a construction template and the main tower, a tower body of the main tower is constructed through combination of a hydraulic creeping formwork and hanging construction of stay cables, the hydraulic creeping formwork bears construction loads of concrete of the constructed sections and transmits the construction loads to a tower column below the constructed sections, the vertical loads of the tower body are transmitted to a main tower bearing platform through the tower body, horizontal force generated due to inclination of the tower body serves as temporary cable stretch-draw balance through the stay cables which stretch or are drawn gradually along with the construction processes, and after the structure of the main tower is capped, all temporary cables stretch and are drawn primarily according to the design requirements to become working cables of the design of the cable-stayed bridge. By means of the method and steel pipe support, in the construction process of the arch tower of the inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge, on the premise of ensuring the stress stability, the construction quality is ensured, and the construction schedule is improved.

Description

technical field [0001] The invention relates to a construction method of an oblique arch tower used in the construction of a prestressed concrete cable-stayed bridge with oblique arch towers and double cable planes. Background technique [0002] In the prior art, when the tower surface is vertical, that is, the tower column is along the bridge without inclination, the construction method of gradually increasing the height of the tower top is adopted, and the support is arranged symmetrically in the arch circle of the tower column. Components to ensure the safety and stability of the tower until the construction reaches the top of the tower. [0003] figure 1 As shown, it is a prestressed concrete cable-stayed bridge with oblique arch towers and double cable planes. The center line of the arch towers and columns is inclined 12° along the bridge direction, and the arch towers are arched in the transverse direction of the bridge. The height of the tower columns reaches 67.597m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D19/14E01D11/04E01D101/28
Inventor 周运志陈军程红松汪树生浦玉东郭乐李彩龙汤云霞周恒树兰宪科朱旭东赵如军
Owner CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products