A technology of steel truss and construction technology, applied in the direction of floors, building components, buildings, etc., can solve the problem of not including inspection standards, and achieve the effect of improving construction quality, increasing joint stiffness, and shortening construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The invention will be further described below with specific examples:
[0030] refer to Figure 1 to Figure 5 , the elevation difference node construction process of steel truss floor deck construction, the steel truss floor deck adopted includes steel bar truss 31 and galvanized plate 30 connected to its bottom, including the following construction steps.
[0031] 1) Prepare Z-shaped backing plate and additional steel bars for nodes
[0032] According to the height difference H of the designed floor, a Z-shaped backing plate 2 is made in advance with a steel plate with a thickness of 5 mm. The Z-shaped backing plate 2 includes a vertical plate 20, and the two sides of the vertical plate 20 are vertically connected to the upper wing 21 and the lower wing 22 respectively. The width of the upper wing is 50mm, and the width of the lower wing is 60mm. The width of the riser 20 is equal to the height difference H of the design floor at the node; the additional reinforcement...