A technology of inrush current and clock synchronization, which is applied in the direction of electrical components, circuit devices, AC network circuits, etc., can solve the problems that the steady-state current of the ring closure and the inrush current can not be accurately and synchronously calculated, and the synchronization cannot be guaranteed, etc. The method is simple Practical, the effect of improving calculation accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0023] Such as figure 1 As shown, the specific steps of using the method proposed in the present invention to calculate the impact current of the distribution network feeder loop closure are as follows:
[0024] Step 1: Take the loop-closing point as the origin, search the transmission network along the feeders on both sides of the loop-closing point according to the topology, and search for the substation bus bars of each voltage level of the feeders on both sides of the loop-closing point, such as 10kV substation and 110kV substation And 220kV substation busbar, etc., determine the position of the boundary node where the feeder on both sides of the loop closure point and the transmission network are handed over.
[0025] exist figure 2 In one example shown, nodes 1 and 2 are different 220kV substations from the transmission grid,...