Production and installation method of reinforced concrete inspection well
A technology of reinforced concrete and installation methods, applied in water supply installations, water conservancy projects, waterway systems, etc., can solve problems such as inability to guarantee quality, low work efficiency, and impact
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] like figure 1 As shown, the assembled inspection well includes a base 4, a well chamber 3, a closing port 2 and a well ring 1, and a hole 5 is opened on the well chamber, through which the drain pipe is connected. The production and installation method of the assembled reinforced concrete inspection well includes the following steps:
[0020] (1) Base and well chamber pouring: make the well chamber reinforcement skeleton, and open holes in the shape of the well chamber reinforcement skeleton that match the pipe diameter of the docked drainage pipe; make the base reinforcement skeleton, place the well chamber reinforcement skeleton and the base reinforcement The skeleton is placed in the mold, and the formed base and the well chamber are formed by the vibration process of the mandrel to make the base and the well chamber; after the base and the well chamber are hoisted, the concrete at the preset hole position of the well chamber should be cleaned in time; After the con...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 