Method for improving dredger fill into greening soil
A technology for filling and greening soil is applied in a utilization field of coastal soil source improvement, which can solve problems such as high investment, limited conditions, and inability to achieve expected results.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0006] This method is used to improve dredging fill soil on the east side of Linhai Road in Dongjiang Port, Tianjin. The demonstration area is 1,000 square meters, the average salt content of the soil is 1.5%, and the pH is 8.3. In April 2011, back-gouging was carried out on the site to drain salt In the project, the distance between blind pipes is 4m, and double blind pipes are laid in the reverse planing groove. The drenching layer is made of clean petite, and the laying thickness is 20cm. After the shower layer is laid, backfill with 1.2m thick dredging fill, and apply improver after leveling the site. The improver consists of 10 parts of desulfurized gypsum, 65 parts of cow dung, 8 parts of superphosphate, and 17 parts of humic acid fertilizer. The dosage per square meter After the soil surface is flattened, the excavator mixes it back and forth 3 times, and the mixing depth is 60cm, and then manually mixes it to level it.
[0007] After mixing, wash the salt with water in...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com