Method of Backfilling Reservoir Diversion Tunnel to Reconstruct Flood Tunnel
A technology of diversion tunnel and flood discharge tunnel, which is applied in construction, water conservancy engineering, marine engineering and other directions, can solve the problems of large investment impact, long construction period and high construction technical requirements, achieve economical and easy construction period, reduce construction difficulty and cost, The effect of shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0008] refer to figure 1 As shown, the method for backfilling and rebuilding the diversion tunnel of the reservoir according to the present invention, during the construction period of the reservoir, the diversion tunnel and the inlet tower 1 of the flood discharge tunnel are combined and arranged in place for diversion during the construction period of the reservoir Channel; the first tunnel section 2 of the diversion tunnel is excavated once to meet the hole height of the flood discharge tunnel after reconstruction; after the construction of the reservoir is completed, put it into the maintenance door slot 3 of the inlet tower 1 Blocking the gate 4, the top elevation of the blocking gate 4 is equal to the elevation of the inlet floor of the spillway tunnel, and then backfilling concrete in the area between the blocking gate 4 and the tunnel section 2 at the head of the diversion tunnel, the diversion tunnel The function of flood discharge can be played by rebuilding it into ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 