Suspension rail type construction trolley
A trolley and tunnel construction technology, which is applied to shaft equipment, shaft lining, mining equipment, etc., can solve the problems of slow construction speed, poor quality, and high working hours, and achieve convenient continuous construction, good pressure bearing capacity, and economical production The effect of fees
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] Attached below Figure 1-5 Carry out embodiment 1 explanation.
[0055] like figure 1 As shown, in the PBA construction method, the initial support 8 of the pilot tunnel is not completely removed, and the unremoved initial support is used as the main supporting platform for the trolley formwork and movement. Ensure that there is enough clearance between the trolley and the earthwork 9 at the bottom to facilitate the passage of construction personnel and material transportation. The trolley is composed of I-shaped steel formwork 2 and adjustable formwork 1. The length of the trolley is 7.5m. The extension direction of the lining pouring, that is, the extension direction of the pilot tunnel) is provided with a span every 0.75m, and each trolley has a total of 11 sets of formwork (with figure 1 It is different as shown in ), and welded on the I20 longitudinal double I-beam (or box steel structural steel) at a distance of 0.75m; φ48 steel pipes are used between each two ...
Embodiment 2
[0062] like figure 1 As shown, in the PBA construction method, the initial support of the pilot tunnel is not completely removed, and the unremoved initial support is used as the main support platform for the trolley formwork and movement. The trolley is composed of I-shaped steel formwork + adjustable formwork. The length of the trolley is 7.5m. A span is set every 0.75m, and each trolley has a total of 11 sets of formwork, which are welded to I20 longitudinal double-span I-beams (or box steel structural steel) at a distance of 0.75m; every two sets of formwork are connected by φ48 steel pipes ( Each group of formwork sets 6 pieces) to ensure its stability; the formwork adopts 1500x750x5mm adjustable steel formwork, the long side is set longitudinally along the buckle arch, the formwork is directly fixed with bolts, and the formwork is welded and fixed with the formwork after the formwork is assembled. There are 25t screw jacks under the vertical double-span I-beam, and the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com