Hot Melt Welding Process of TV Bracket
A TV bracket and hot melt welding technology, applied in welding equipment, non-electric welding equipment, manufacturing tools, etc., can solve the problems of low finished product quantity and efficiency, low welding efficiency, high cutting cost, etc., and achieve fast process, beautiful appearance, The effect of improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] Clamp the workpiece to be welded, and first apply force to the workpiece to be welded through the impact force of 150kg, so that the part to be welded is in contact. When the temperature is 1200 ° C, according to the formula F = P / V, select the P of the first hot melt as 75KW, the speed is 0.5mm / s, and the melting time is 3S. At this temperature, according to the formula F = W / S, push the product to be welded forward 8mm, perform the second melting and welding, and select W as 1200J , the second hot-melt welding lasts for 4S, and the time interval between the first hot-melt and the second hot-melt welding is 0.1s, and the finished product can be further processed by grinding the surface of the weld, In order to make the surface of the welding place smooth and smooth.
Embodiment 2
[0027] Clamp the workpiece to be welded, firstly apply force to the workpiece to be welded through the impact force of 150kg, so that the part to be welded is in contact, when the temperature is 1400°C, according to the formula F = P / V, select the P of the first hot melt as 80KW, the speed is 0.5mm / s, and the melting time is 3S. At this temperature, according to the formula F = W / S, advance the product to be welded 9mm forward for the second melting and welding, and choose W as 1600J , the second hot-melt welding lasts for 3S, and the time interval between the first hot-melt and the second hot-melt welding is 0.1s, and the finished product can be further processed by grinding the surface of the weld, In order to make the surface of the welding place smooth and smooth.
Embodiment 3
[0029] Clamp the workpiece to be welded, first apply force to the workpiece to be welded through the impact force of 150kg, so that the part to be welded is in contact, when the temperature is 1500°C, according to the formula F = P / V, select the P of the first hot melt as 85KW, the speed is 0.5mm / s, and the melting time is 2S. At this temperature, according to the formula F = W / S, push the product to be welded forward 10mm, perform the second melting and welding, and select W as 2000J , the second hot-melt welding lasts for 3S, and the time interval between the first hot-melt and the second hot-melt welding is 0.1s, and the finished product can be further processed by grinding the surface of the weld, In order to make the surface of the welding place smooth and smooth.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More