Multi-constraint wait-free hybrid running water scheduling modeling method based on idle matrix
A modeling method and multi-constraint technology, which is applied in the modeling field of mixed pipeline scheduling, can solve problems such as reducing the computational complexity of no-waiting pipeline scheduling, inability to apply multi-constraint non-waiting mixed pipeline scheduling, ignoring preparation time, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0046] There are 3 tasks J1, J2, and J3 to be processed. There are 3 stages in the processing process. In the second stage, there are 2 same processors. Task 2 does not need to be processed in the first stage, and has a sequence-dependent preparation time SU. Task 3 must be processed before task 2, and the task scheduling objective is to minimize the maximum completion time C max .
[0047] Assuming processing time, the order-dependent preparation time is shown in Table 1 and Table 2, respectively.
[0048] Table 1: Processing time P
[0049] J1 J2 J3 P1 14 15(0) 11 P2 18 16 16 P3 13 20 14
[0050] Table 2: Order-dependent setup time SU
[0051] J1 J2 J3 J1 - 4 1 J2 3 - 3 J3 2 1 -
[0052] The concrete steps of this embodiment are:
[0053] Step 1: Preparation Stage: Press figure 1 The two-step method in the processing.
[0054] Step 2: Constraint preprocessing: set the processing time P of ta...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com