Measurement and control method for bridge construction

A technology for measurement control and bridge construction, which is applied in the direction of measuring devices, measuring instruments, height/level measurement, etc., can solve problems such as the influence of construction accuracy, and achieve the effects of ensuring accuracy, wide adaptability, and simple and reliable construction methods

Inactive Publication Date: 2015-03-25
中铁建生态环境有限公司
View PDF4 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to overcome the above-mentioned problems that human factors in the prior art have an impact on construction accuracy, and provide a measurement control method for bridge construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Measurement and control method for bridge construction
  • Measurement and control method for bridge construction
  • Measurement and control method for bridge construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be further described in detail below in conjunction with test examples and specific embodiments. However, it should not be understood that the scope of the above subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0027] Such as figure 1 Described, a kind of measurement control method for bridge construction, comprises carrying out control measurement to following parameter:

[0028] a. Plane control measurement. Before the start of construction, the construction plane control network is densely laid out to ensure the accuracy of the bridge 2 plane control measurement, thereby creating favorable conditions for the stakeout work; the horizontal angle observation adopts 8 measurement rounds, and observes its left corner respectively Take the average value after 4 measurement rounds for the rig...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a measurement and control method for bridge construction. The measurement and control method comprises the measurement on the following parameters: plane control and measurement, elevation control and measurement, perpendicularity control and measurement, beam part construction measurement, template offset correction control, high pier sedimentation and beam body creep monitoring. By using the measurement and control method disclosed by the invention, all corresponding control measures and methods are proposed by analyzing all factors influencing the construction measurement accuracy, so that the influence of human factors on the construction accuracy is scientifically and effectively reduced, and the setting-out accuracy is effectively guaranteed; and the construction method is simple and reliable and the adaptability is wide.

Description

Technical field [0001] The invention involves a bridge engineering field, which specializes in a measurement control method for bridge construction. Background technique [0002] For large span tall bridge pier bridges, the measurement control of the bridge is crucial. How to ensure that the measurement control meets the construction requirements during the bridge construction process is a general concern. [0003] At present, the factors that affect the accuracy of high -pier construction are divided into natural factors and human factors. Among them, natural factors mainly refer to the temperature load caused by wind load, solar radiation, and heating up;, Then affect the quality of construction.Therefore, it is necessary to reduce the impact of construction accuracy caused by human factors through some measurement methods. This is a technical problem that has always been solved. Invention content [0004] The purpose of the present invention is to overcome the above problem...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01C15/00G01C5/00G01B21/22G01B21/32
CPCG01C15/00G01B21/22G01B21/32G01C5/00
Inventor 于晓明于国浩徐秀良刘延龙张志刚王立文
Owner 中铁建生态环境有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products