Spud shoe priority docking process

A pile boot and process technology, applied in the field of the pile boot priority docking process, can solve problems such as easy collapse, and achieve the effects of fast construction speed, good quality and good construction stability

Active Publication Date: 2017-11-14
舟山长宏国际船舶修造有限公司
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The problem to be solved by the present invention is that the existing dry dock integrally builds the offshore platform and directly supports it with pile legs and is easy to collapse.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Spud shoe priority docking process
  • Spud shoe priority docking process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0020] Taking the spud shoe priority docking process of a 90-meter offshore platform as an example, it includes the following steps:

[0021] A. Tooling production and installation in place: Through the overall consideration of the process, it is first necessary to make the spud shoe tooling 1 and install the spud shoe tooling 1 at the four spud shoe positions in the dock;

[0022] B. Complete loading of the main hull: carry out the loading of the main hull of the platform according to the process sequence of the loading network diagram, and install the local supports of the main hull in the area of ​​the four spud shoes at the same time;

[0023] C. Docking of the first section of pile leg 4 with spud shoe 3: After the main hull of all platforms is loaded, and all components and equipment in the enclosure area are installed, the docking work of the fir...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The spud shoes are given priority to docking process, and the tooling is made and installed in place: through the overall consideration of the process, it is first necessary to make specific tooling and install complete tooling at the four spud shoes in the dock; the main hull is fully loaded: according to the loading network diagram process Carry out the loading of the main hull of the platform in sequence, and install the partial support of the main hull in the area of ​​the four spud shoes at the same time; the first section of the spud legs is docked with the spud shoe: after all the main hulls of the platform are loaded, and all the components and equipment in the surrounding well area are installed , to carry out the docking work of the first section of spud legs and spud boots. At this time, complete assembly can be carried out by docking the spud boots; the spud boot tooling is filled with sand and load-bearing: the spud boot tooling is filled with fine sand, and the thickness is about 700mm for the first time Sand layer, and make it load-bearing, while the spud shoe support parts will not be dismantled for the time being; the construction method of this process has good construction stability, is not prone to collapse and other installation accidents, and the construction speed is fast and the quality is good, which is well received by users.

Description

technical field [0001] The invention relates to a spud shoe priority docking process and belongs to the technical field of ships. Background technique [0002] With the development of modern science and technology, the shipbuilding industry is developing more and more high-end, from the original small wooden boats to 10,000-ton steel ships, especially the construction of large offshore platforms, which has pushed the marine industry to the highest end, but The construction of the offshore platform is very difficult. Because it has four legs, it bears a lot of weight in the dry dock, and it is easy to collapse if it is directly supported by the legs. It must be built with appropriate technology, which is an urgent problem to be solved. Contents of the invention [0003] The purpose of the present invention is to provide a spud can priority docking process. [0004] The problem to be solved by the present invention is the shortcoming that the existing dry dock integrally bu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): B63B9/00
Inventor 汪家政
Owner 舟山长宏国际船舶修造有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products