Dike allowing easy passage
A technology for berms and sidewalks, applied in the field of berms that are easy to pass, can solve problems such as easy falls, time wasting, and difficult walking, and achieve the effects of reducing falls, reducing difficulty, ensuring service life and safety factor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0010] refer to figure 1 , a kind of easy-to-pass embankment, comprising a berm body 1 and a reinforced wall 2, the berm body 1 is trapezoidal, and the side of the berm body 1 near the water surface is laid with the reinforced wall 2, The side of the berm body 1 against the water surface has a slope of 40 °, and the side of the berm body 1 not close to the water surface has a slope of 60 °; the thickness of the reinforced wall 2 is 20 cm, and the reinforced wall 2 is made of The wall bricks are compacted and formed; the reinforced wall 2 is provided with a plurality of stepping sidewalks 3 that are convenient for people to pass at intervals of 15m, and the stepping sidewalks 3 are formed by such as figure 2 The embankment bricks 4 shown are formed by tamping. Corresponding stepping bumps 41 are provided above the outer surfaces of the embankment surrounding bricks 4 , and corresponding supporting ribs 42 are arranged under the stepping bumps 41 . After the embankment surroun...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com