Simple monitoring device for earth surface cracks
A surface crack and monitoring device technology, applied in the field of surface crack monitoring, can solve the problems of inaccurate measurement data, difficulty in ensuring accuracy, waste of resources, etc., and achieve the effects of expanding the scope of application, ensuring accuracy, and increasing stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0023] Example 1
[0024] See figure 1 with image 3 , A simple monitoring device for surface cracks, including a convergence meter 1, a geological compass 7, and two 1.5m-long hollow stainless steel pipes 3. The two stainless steel pipes 3 are located on both sides of the surface crack 2, and the two stainless steel pipes 3 are connected. The line is perpendicular to the direction of the surface crack 2; the hooks at both ends of the convergence meter 1 are hooked to the tops of the two stainless steel tubes 3; the geological compass 7 is located between the two stainless steel tubes 3, close to the steel ruler of the convergence meter 1 to measure the stainless steel tube 3 The azimuth of the connection;
[0025] The tail end of the stainless steel pipe 3 is provided with a chamfered surface for easy insertion into the soil, the stainless steel pipe 3 is 1 m away from the edge of the ground crack 2 on the same side, and the top end of the stainless steel pipe 3 is 0.5 m away from...
Example Embodiment
[0034] Example 2
[0035] See Figure 4-Figure 5 The difference from Embodiment 1 is that the stainless steel pipe 3 is 1.5 m away from the edge of the surface crack 2 on the same side, and the top end of the stainless steel pipe 3 is 0.7 m away from the ground surface.
[0036] In the soil that is difficult to hammer into the stainless steel pipe 3, you can first excavate a pit and then hammer the stainless steel pipe 3 into the soil, and then pour concrete in the pit to form a concrete layer 4 (concrete pier ) In order to fix the stainless steel pipe 3 and avoid the shaking of the stainless steel pipe 3.
PUM
Property | Measurement | Unit |
---|---|---|
Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap