[0029] Use two auxiliary steel pipes to hoist purlins at the same time. The auxiliary steel pipes are composed of steel pipe 1, steel ring 2, steel traveler 3, lifting ring 4, and lifting point 5. The steel ring 2 is welded on the steel pipe 1. The number of steel rings is the same as the required installation of purlins. The number of steel rings is the same, the distance between the steel rings 2 is the same as the distance between the beam purlins, the steel rings 3 pass through the steel rings 2 and are set on the steel pipe 1, and the lifting rings 4 are sleeved under the steel rings 3, The lifting point 5 is a semicircular structure welded on the steel pipe 1 with a steel bar, and there are three in number. The steel ring 2 is made of 6mm thick steel bar. The traveler 3 is made of 5mm thick steel bar.
[0030] When installing purlins, the purlins to be installed are assembled on the ground, using two auxiliary steel pipes as supports, and the lifting ring 4 of each auxi...
Embodiment 2
[0032]Use an auxiliary steel pipe to hoist purlins and a roof beam at the same time. The auxiliary steel pipe is composed of steel pipe 1, steel ring 2, steel traveler 3, lifting ring 4, and lifting point 5. The steel ring 2 is welded on the steel pipe 1. The number of steel rings The number of purlins required to be installed is the same, the distance between the steel rings 2 is the same as the distance between the purlin supports of the roof beams, the steel traveler 3 passes through the steel rings 2 and is set on the steel pipe 1, and the lifting ring 4 is sleeved on the Below the traveler 3, the lifting point 5 is a semicircular structure welded on the steel pipe 1 with steel bars, and the number is three. The steel ring 2 is made of 6mm thick steel bar. The traveler 3 is made of 5mm thick steel bar.
[0033] During installation, the purlins and roof beams to be installed are assembled on the ground according to the overall design of the barn, and an auxiliary steel pip...
Embodiment 3
[0035] Use an auxiliary steel pipe to hoist purlins and two roof beams at the same time. The auxiliary steel pipe is composed of steel pipe 1, steel ring 2, steel traveler 3, lifting ring 4, and lifting point 5. The steel ring 2 is welded on the steel pipe 1. The number of steel rings The number of purlins required to be installed is the same, the distance between the steel rings 2 is the same as the distance between the purlin supports of the roof beams, the steel traveler 3 passes through the steel rings 2 and is set on the steel pipe 1, and the lifting ring 4 is sleeved on the Below the traveler 3, the lifting point 5 is a semicircular structure welded on the steel pipe 1 with steel bars, and the number is three. The steel ring 2 is made of 6mm thick steel bar. The traveler 3 is made of 5mm thick steel bar.
[0036] During installation, the purlins and roof beams to be installed are assembled on the ground according to the overall design of the barn, and an auxiliary steel...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com