Construction method for rib planting and wall protecting of tunnel arc arch
An arc arch and tunnel technology, applied in tunnels, tunnel linings, temporary shields, etc., can solve problems such as endangering the safety of construction workers, difficult to meet the requirements of design and specifications, and difficult to ensure that the planting reinforcement holes are perpendicular to the tunnel arc arch wall. , to avoid falling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0022] The construction method of tunnel arch reinforcement and retaining wall includes the following steps:
[0023] A, prepare protective cover 2, protective cover 2 comprises protective cover bottom plate 2-5 and some protective cover vertical plates 2-2 that are connected with protective cover bottom plate 2-5; Each protective cover vertical plate 2-2 is arranged at intervals, adjacent protection There is a dirt tank 2-6 between the cover vertical plates 2-2; the protective cover bottom plate 2-2 is provided with a cross-shaped incision 2-3 and a fixing hole 2-4, and the edge of the protective cover bottom plate 2-2 is provided with a connecting hole 2 -1;
[0024] B. Set up arc-arch scaffolding and drilling rig lifting operation platform;
[0025] C. Drill expansion bolt holes on the tunnel arch 1, pass the expansion bolts through the fi...