An anti-collapse two-way rib jet grouting drill bit and its application method
A jet grouting and anti-collapse technology, which is applied in the direction of drill bit, earthwork drilling, drilling equipment, etc., can solve the problems such as short solidification time of quick-setting grout, difficulty in eliminating hole wall shrinkage or collapse and falling off, difficult engineering accidents, etc. problems, to achieve the effect of improving the effect of spray reinforcement and shortening the waiting time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0053] A coal mine in Heze, Shandong Province is a mine with extremely complex hydrogeological conditions. Concentrated and scattered water gushes appear on the roof of the mine's total return air uphill roadway, with a large area of water gushing and a total water gushing volume of 25m 3 About / h, the water source is fine sandstone (M5), and the normal water pressure of the aquifer in the treatment area is 3.5MPa. During the construction of M5 grouting and water blocking drilling, because the shallow surrounding rock was loose and broken, the drilling hole wall collapsed severely, and drilling accidents occurred frequently; The slurry is made of cement slurry, and the cement slurry needs 72 hours to consolidate according to the design, and the waiting time for setting is long. Sometimes, the phenomenon of collapse and block falling still occurs after re-drilling in the drilled hole reinforced by grouting. Seriously affected the progress of the project. In the later study,...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 