Problems solved by technology

[0006] The traditional method has the disadvantage that the erection of the boiler is very time consuming since the different components are installed one by one and in sequence

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for erecting a boiler, module and boiler comprising the module
  • Method for erecting a boiler, module and boiler comprising the module
  • Method for erecting a boiler, module and boiler comprising the module

Examples

Experimental program
Comparison scheme
Effect test

example 1

[0025] Example 1 – Erection by means of temporary lifting structures

[0026] In the first embodiment of the present invention ( Figure 1-7 shown in ), first build the main structure 1 ( figure 1 ), after which one or more temporary lifting structures including lifting towers 13a are installed next to the main structure 1; strand jacks 7 are preferably provided on the lifting towers 13a and the main structure 1, and modules 3 ready for installation are provided ( figure 2 ).

[0027] The module 3a is thus preferably placed in its final footprint 9 ( image 3 ), and it is raised by a strand jack 7 of height H, which is large enough to allow the additional module 3b to be positioned below module 3a ( Figure 4 ).

[0028] The additional module 3b is thus provided and the module 3a is positioned on top of the additional module 3b (thereby the additional module 3b is positioned below the module 3a, preferably in its final footprint 9); the module 3a and the additional modu...

example 2

[0035] Example 2 – Erection by means of temporary lifting structures including bridges

[0036] In the second embodiment of the present invention ( Figure 8-16 shown in ), first build the main structure 1 ( Figure 8 ); then build one or more temporary elevating structures next to the main structure 1 and connect them to the main structure 1 ( Figure 9 ).

[0037] The temporary lifting structure comprises a lifting tower 13a and a bridge 13b connecting the lifting tower 13a to the main structure 1 . On top of the bridge 13b, a carrier 14 with a strand jack 7 is provided.

[0038] Provides ready-to-install modules 3 ( Figure 10 ), then module 3a is preferably provided in its final footprint ( Figure 11 ).

[0039] The additional module 3b is then provided next to the module 3a and it is raised by the strand jack 7 ( Figure 12 ), move it by the carrier 14 ( Figure 13 ), and thus connect the additional module 3b to the top of the module 3a ( Figure 14 ) to define ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The method for erecting a boiler (15) comprises erecting a main structure (1), providing preassembled modules (3) defining a boiler section, installing the modules (3) outside the main structure (1).

Description

technical field [0001] The present disclosure relates to a method for erecting a boiler, a module and a boiler including the module. [0002] The boiler is preferably a large boiler of a power plant. For example the boiler is a tower boiler, but other types of boilers are feasible, eg 2-pass boilers. Background technique [0003] To erect a boiler, a main structure (main steel structure) is traditionally installed, and then all boiler components are sequentially installed on and around the main structure, one by one. [0004] Thus, for example, the sequence could be erecting the main structure, installing struts / headers and vertical heat exchange walls at the upper part of the main structure, installing internal heating surfaces (economizer, reheater, superheater), and then A vertical heat exchange wall is installed at the lower part of the unit. [0005] The flue gas ducts and other components, such as pipes, compartments, accessories, cable trays, etc., are then usually...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F22B35/08F22B37/00
CPCF22B37/24F22B37/001F22B37/244F24H9/00
Inventor C.博伊克
Owner GENERAL ELECTRIC TECH GMBH