A method for installing a two-story roof
An installation method and wood-based technology, applied in the direction of ceilings, building components, buildings, etc., can solve the problems of slow construction speed, high difficulty and low efficiency, and achieve the effect of reducing the risk of working at heights and shortening the construction period.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] refer to figure 1 , figure 2 with image 3 , a two-story roof installation method of the present invention, comprising the following steps:
[0028] a) Material preparation: three triangular keels, four wooden squares, 40 round second-line light cards with 80 screws, eight large petals on the second layer and four small petals on the third layer, two round second-line light strips;
[0029] b) Cutting material: Cut the log square into one 1.7m wooden square, two 82cm wooden squares, two 90cm wooden squares, two 84cm wooden squares, two 50cm wooden squares and two 46cm wooden squares root, four 58cm wooden squares, cut the triangular keel into one 1.7m, two 82cm, and four 58cm;
[0030] c) Splicing: splicing two 84cm wooden squares and two 90cm wooden squares into a large rectangular frame, and in the large frame, splicing 50cm wooden squares and 46cm wooden squares into a small rectangular frame and 50cm wooden squares and 90cm wooden squares. The centimeter wooden...