Method for controlling participation of battery energy storage system in power grid secondary frequency modulation

A battery energy storage system, secondary frequency modulation technology, applied in flexible AC transmission systems, electrical components, circuit devices, etc., can solve the problem of increased fuel usage and operating costs, geographical and seasonal effects of hydroelectric units, delays and deviations, etc. question

Active Publication Date: 2015-12-23
NANJING INST OF TECH
View PDF2 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the inherent characteristics of traditional frequency modulation units, especially in power systems containing large-scale new energy power generation, there are various defects and deficiencies in traditional frequency modulation methods
Hydroelectric units are the most suitable energy source for participating in power grid frequency regulation, but hydroelectric units are easily affected by regions and seasonality
Traditional frequency modulation units are composed of mechanical devices with rotational inertia. It takes a relatively long period of time to convert primary

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for controlling participation of battery energy storage system in power grid secondary frequency modulation
  • Method for controlling participation of battery energy storage system in power grid secondary frequency modulation
  • Method for controlling participation of battery energy storage system in power grid secondary frequency modulation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0038] Embodiments By installing the battery energy storage system in a system that needs to cooperate with traditional frequency modulation units, the unbalanced power between the load and power generation in the area is collected from the control center in real time, and the battery energy storage system is determined to participate in the power grid according to the size of the unbalanced power. The adjustment coefficient of the secondary frequency regulation, thereby changing the final output of the battery energy storage system participating in the secondary frequency regulation of the power grid.

[0039] The relationship between the unbalanced amount of load and generated power in the grid and the adjustment coefficient of the battery energy storage system can be established according to different indicators or criteria, so as to achieve a specific goal. Realize the self-adaptive control of the battery energy storage system to cooperate with the traditional unit to parti...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a method for controlling participation of a battery energy storage system in power grid secondary frequency modulation. An adjustment coefficient of participation of the battery energy storage system in the power grid secondary frequency modulation and a relation between the adjustment coefficient K2 and the amount of unbalance [delta]P of a load and generated power in a power grid are determined through the amount of unbalance [delta]P of the load and generated power in the power grid, after the amount of unbalance [delta]P of the load and generated power in the power grid goes through a generator-load frequency characteristic link, a frequency difference value [delta]f of a system is obtained, after a PI link of each power supply participating in the power grid secondary frequency modulation, to-be-changed-power of each power supply is obtained. The method can change the final output magnitude of participation of the battery energy storage system in the power grid secondary frequency modulation, the battery energy storage system realizes participation in the power grid secondary frequency modulation process through charging and discharging control, fire coal loss of a traditional unit can be reduced, and thus frequency modulation cost is reduced; and a balance between power supply power generation and load power utilization can be maintained rapidly.

Description

technical field [0001] The invention relates to a control method for a battery energy storage system participating in secondary frequency regulation of a power grid. Background technique [0002] Power system frequency is one of the three major indicators of power quality, and its deviation reflects the balance between the active power provided by the system and the load demand. Since the primary frequency regulation of the power grid relies on its own inherent frequency characteristics to prevent system frequency deviation, and cannot achieve zero-difference regulation, the secondary frequency regulation is to change the position of the differential regulation characteristic curve of the generator set on the basis of primary frequency regulation to achieve zero-difference regulation. Suitable for adjusting load fluctuations in minutes or worse. [0003] The increasing shortage of traditional energy sources and the deterioration of the environment have promoted the rapid de...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H02J3/00
CPCY02E40/10
Inventor 翟晶晶郝思鹏彭建宇刘皓明王尉杰
Owner NANJING INST OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products