Power distribution network N-1 calibration method taking segmental load transfer into consideration

A technology of load transfer and verification method, applied in electrical components, circuit devices, AC network circuits, etc., can solve the problem of failing to pass verification, not considering segmented transfer, and difficult to meet the refined analysis and management of distribution network And other issues

Inactive Publication Date: 2015-12-30
STATE GRID CORP OF CHINA +3
View PDF4 Cites 27 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The traditional N-1 inspection of the medium-voltage distribution network mainly adopts a "one size fits all" approach to consider the transfer results, considering whether the entire line passes through, and does not consider the situation that some segments in the line can be segmented for transfer, that is, when the contact When the capacity of the channel is sufficient, it is considered that the verification can be passed; when the capacity of the communication channel is not enough to carry all the loads to be transferred, it is considered that the verification cannot be passed extensively, and the specific loss load cannot be calculated in detail
Obviously, the results obtained by using the traditional verification method are not enough to reflect all the verification information, and it is difficult to meet the requirements of fine analysis and management of distribution network

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power distribution network N-1 calibration method taking segmental load transfer into consideration
  • Power distribution network N-1 calibration method taking segmental load transfer into consideration
  • Power distribution network N-1 calibration method taking segmental load transfer into consideration

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0116] Assume that there are 3 substations and 18 circuits in a certain power supply block. In view of the large amount of basic data of the circuits and the limited space, we will not list them here. The basic information and contact relationship of the main transformer of the network are shown in Table 1 and figure 2 Shown:

[0117] Table 1 Overview of Substation

[0118]

[0119] (1) Line N-1 verification

[0120] Perform line N-1 verification judgment according to the line N-1 verification criterion, and the results are shown in the following table:

[0121] Table 2 Check result of network line N-1

[0122] line number

N-1 verification result

Unable to transfer scope

line number

N-1 verification result

Unable to transfer scope

1

pass

2

pass

3

pass

4

pass

5

Fail

Stage 1 load

6

Fail

Stage 1 load

7

pass

8

Fail

1...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A power distribution network N-1 calibration method taking segmental load transfer into consideration comprises the following steps: carrying out initial analysis of a lattice structure; carrying out simplification analysis of the lattice structure; analyzing circuit transfer analysis; carrying out N-1 calibration and load loss calculations of a circuit and N-1 calibration and load loss calculations of a main transformer respectively, namely, carrying out load segmental cutting sequentially when N-1 calibration and N-1 calibration of the circuit and the main transformer do not pass, and carrying out load transfer capability analysis of the main transformer, load transfer analysis of an interconnection unit of a transformer station, overload transfer correction of the main transformer, and transfer capability calculation of the network of the transformer station sequentially; carrying out load segmental cutting when N-1 calibration and N-1 calibration of the circuit and the main transformer does not pass. The calibration method has the advantages that the power distribution network N-1 calibration result can be higher under the premise that the calculation accuracy is guaranteed; load is cut when a calibration result does not pass, so as to facilitate improvement of calibration level of power distribution network power supply safety, and more accurately guide analysis and selection of planning, reformation and running method of a power distribution network.

Description

technical field [0001] The invention relates to an N-1 verification method of a distribution network. In particular, it relates to a distribution network N-1 verification method for distribution network power supply safety inspection considering segmental load transfer. Background technique [0002] The distribution network plays a very important role in the distribution of electric energy in the power network. In the series of links of power generation, transmission, distribution, and power consumption, it is responsible for supplying electric energy to each distribution station and various electric loads, and is the final distribution of electric energy. The terminal network of the power system is a link directly connected with customers in the power system. In distribution network planning, operation and scheduling, the N-1 safety criterion is usually used to evaluate the distribution network connection mode, that is, to check whether the distribution network planning de...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00
Inventor 黄俊辉刘洪韩俊李琥谈健陈正方赵浛蔡期塬
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products