Controlled blasting and protecting method for major bridge foundation on two sides of high and steep gorge in scenic spot
A technology for controlling blasting and canyons, which is applied in blasting and other directions, can solve problems such as narrow construction sites and prohibition of blasting construction, and achieve the effect of ensuring human safety and broad application prospects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] refer to Figure 1 to Figure 7 , which shows the specific structure of the preferred embodiment of the present invention. The structural features of each element of the present invention will be described in detail below, and if there is a description of the direction (up, down, left, right, front and back), it is based on figure 1 The shown structure is a reference description, but the actual use direction of the present invention is not limited thereto.
[0033] The present invention provides the technical solution adopted by the present invention to solve the technical problem: a method for controlling the blasting and protection of bridge foundations on both sides of a high and steep canyon in a scenic spot, comprising the following steps:
[0034] S10. Set fence protection 1 that can block the rolling stones produced during blasting on the slopes and valleys below the canyon blasting site; set up a protective shed 2 that can withstand rolling stones produced durin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com