Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Jacking construction method for prefabricated frame with inversely arranged oil top on variable ramp

A construction method and technology of oil top, applied in the direction of road bottom layer, building, etc., can solve problems such as slideway damage, frame structure damage, slideway structure damage, etc., and achieve good operation results

Active Publication Date: 2016-04-13
中铁二十五局集团第三工程有限公司 +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] 2. Jacking start: see image 3 , ①The front end of the prefabricated frame is in a suspended state. As the prefabricated frame moves forward, the contact surface between the prefabricated frame and the slideway becomes smaller and smaller, and the slideway bears an increasing load per unit area from the self-weight of the prefabricated frame. Concentration, it is easy to cause damage to the slideway structure, and the jacking slideway needs to be reinforced; ②The front section of the prefabricated frame is in a suspended state. Under the action of gravity of the suspended section, it is equivalent to applying a variable torque to the prefabricated frame. "Up-slope point" is the clockwise twisting trend of the fulcrum, so that tensile stress appears on the top and bottom surfaces of the prefabricated frame, which may lead to the destruction of the prefabricated frame structure
[0011] 6. See Figure 7 , the prefabricated frame passes through the downward slope point: ①One end of the prefabricated frame acts on the glideslope, and the other end acts on the slope, forming a concentrated load on the glideslope and the slope respectively, which is very easy to damage the slide and also easy to improve the prefabricated frame. Cause damage; ②The downward slope point is suspended in the air, under the action of gravity, the bottom of the bottom plate of the frame structure and the bottom surface of the top plate are likely to form tensile stress and cause damage to the frame structure
When the jacking slideway is a variable slope slideway, such as Figure 10 shows that when the prefabricated frame 4 passes through the upslope point (such as image 3 and Figure 4 ), the prefabricated frame 4 rotates, the rear end tilts, and the direction of the force transmission rod 3 is not parallel to the axis of the prefabricated frame bridge culvert, so that the force transmission rod cannot transmit the oil jacking force to the end of the prefabricated frame bridge culvert well, and may even It also led to the loss of stability of the dowel members, making it impossible to continue the prefabricated frame jacking construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Jacking construction method for prefabricated frame with inversely arranged oil top on variable ramp
  • Jacking construction method for prefabricated frame with inversely arranged oil top on variable ramp
  • Jacking construction method for prefabricated frame with inversely arranged oil top on variable ramp

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] The present invention will be further described below in conjunction with accompanying drawing.

[0048] see Figure 11 Put the oil top 2 on one end of the prefabricated frame 4, the back seat of the oil top 2 is placed against the prefabricated frame 4, the piston rod of the oil top 2 is connected with the force transmission rod 3 and placed on the back 1, through the oil The jack 2 applies a jacking force to the back 1, and according to the principle of action force and reaction force, the rear seat of the oil jack 2 pushes the prefabricated frame 4 to move forward.

[0049] according to Figure 11 It shows that the application of the oil top inversion technology on the variable slope slideway needs to solve the following problems:

[0050] ①The jacking stroke of the prefabricated frame 4 reaches 60m, and the force transmission rod 3 is in an inclined state, which may cause the force transmission rod 3 to lose stability during the jacking process; the vertical plane...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Thicknessaaaaaaaaaa
Login to View More

Abstract

The invention discloses a jacking construction method for a prefabricated frame with an inversely arranged oil top on a variable ramp. The method comprises the following steps: arranging a weak transition section at a gradient change point, namely breaking a concrete slide way to form a weak section of a soil foundation; inversely arranging the oil top at one end of the prefabricated frame, arranging a rear seat of the oil top in a mode of backing on the prefabricated frame, connecting a piston column of the oil top with a force transfer member bar on the back, applying jacking force to the back through the oil top, and enabling the rear seat of the oil top to push the prefabricated frame to move forward for jacking; and jacking the prefabricated frame, dismounting the force transfer member bar, performing following up pouring on step type concrete rear seats, mounting the force transfer member bar, jacking the prefabricated frame, dismounting the force transfer member bar, performing following up pouring on step type concrete rear seats, mounting the force transfer member bar, continuing to jack, and executing the processes circularly until the prefabricated frame is jacked in place according to the design. The jacking construction method for the prefabricated frame with the inversely arranged oil top on the variable ramp, disclosed by the invention, can be used for ensuring continuous and stable jacking construction of the prefabricated frame on the variable ramp.

Description

technical field [0001] The invention relates to a prefabricated frame jacking construction method, in particular to a prefabricated frame jacking construction method with an oil roof reversed on a variable slope. Background technique [0002] For the high culvert project passing under the railway, the construction plan adopts prefabrication in the working pit outside the railway subgrade, and then the overhead railway is jacked into place according to the design. [0003] After the off-line prefabrication of the main body of the prefabricated frame was completed, it was found that the actual elevation of the upstream drainage culvert did not match the design. In order to solve the problem of culvert drainage, it is necessary to lower the design elevation of the culvert in the railway-related section. After calculation, the elevation drops by 65cm. Since the prefabricated frame has been prefabricated according to the original design elevation, the jacking slideway of the pre...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01F5/00
CPCE01F5/005
Inventor 李红斌周烽尹育文谌荣华左拥政徐根保谭包海王春勇谭国文边俊孙进彭瑶童黄敏杨磊张琴康晖何智超仇建坤刘汉华熊宾松
Owner 中铁二十五局集团第三工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products