A Splicing Method for Vertical Connection of Prefabricated Underground Diaphragm Wall
A technology of underground continuous wall and ground-connected wall, applied in sheet pile wall, construction, infrastructure engineering and other directions, can solve the problems of concrete flow around, groove wall collapse, etc., to increase bearing capacity and strength, reduce water seepage, The effect of shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The following combination Figure 1 to Figure 5 , the present invention will be further elaborated by specifying a preferred specific embodiment.
[0026] The splicing method for the vertical connection of the prefabricated underground diaphragm wall provided by the present invention is used for the splicing of the underground diaphragm wall as foundation pit enclosure and basement exterior wall, comprising the following steps:
[0027] S1, such as image 3 As shown, the first prefabricated underground continuous wall 10 is made, and a first gap is opened inside one end of the first prefabricated underground continuous wall 10 to form a first knife handle structure 11 outside the end of the first prefabricated underground continuous wall 10. I-beam 12 is pre-embedded in a gap;
[0028] S2, such as image 3 As shown, the second prefabricated underground continuous wall 20 is made, and a second gap is opened on the inside of one end thereof, so that the second knife ha...