Assembled cement prefabricated double-layer cable trench and its manufacturing method
A cable trench and assembly type technology is applied in the field of prefabricated cement prefabricated double-layer cable trench and its manufacturing, which can solve problems such as non-hair adaption, and achieve the effects of shortening the construction period, facilitating trench installation, and unifying the system.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0075] see Figure 1 to Figure 4, an assembled cement prefabricated double-layer cable trench, including a trench base 1 and a cover plate 2, the cover plate 2 is arranged on the trench base 1, and the trench base 1 is a concrete prefabricated part; the trench The groove base 1 comprises a groove bottom plate 11, a groove back wall 12, a first groove wall 13, a second groove wall 14, a groove face wall 15 and a groove top plate 16, the groove back wall 12, the first groove wall The bottoms of the groove wall 13, the second groove wall 14 and the groove wall 15 are all fixedly connected with the top surface of the groove bottom plate 11, and the tops of the second groove wall 14 and the groove wall 15 are connected with the groove The bottom of the top plate 16 is fixedly connected; a closed cable groove 3 is formed between the groove bottom plate 11, the second groove wall 14, the groove surface wall 15 and the groove top plate 16, and the groove on the groove bottom plate 11 ...
Embodiment 2
[0083] Embodiment 2 is basically the same as Embodiment 1 and its difference is:
[0084] The front tenon 71 , the rear tenon 73 and the upper tenon 75 are located on the same side of the groove base 1 .
Embodiment 3
[0086] Embodiment 3 is basically the same as Embodiment 1 and its difference is:
[0087] Described 3rd step: closing mold comprises the following steps:
[0088] a, the cage frame that steel bar is made is placed on the outer mold 81, the cage frame support is installed on the bottom of the cage frame, after placing, there is no direct contact between the cage frame and the outer mold 81;
[0089] b. After placing the cage, close and lock the front formwork 82, rear formwork 83, convex formwork 84 and notch formwork 85, insert the mandrel 86 and adjust the mandrel 86 to make it tighter. At this time, the mold clamping is completed .
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com