Integrated monitoring and early warning system for geological mountain torrent disaster and realization method thereof
A geological disaster and comprehensive monitoring technology, applied in alarms, climate change adaptation, instruments, etc., can solve problems such as insufficient practicability, reduced system operation reliability, and high construction costs, and achieve easy popularization and application, good early warning effects, and durability cost effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0057] Example 1: Example of Simple Rural Mountain Flood Geological Disaster Monitoring and Early Warning
[0058] In the technical solution of this embodiment, the monitoring area prone to mountain torrent geological disasters is selected, and the layout of monitoring piles is reasonably planned.
[0059]Flood monitoring piles are used for real-time and simple monitoring of floods. Flood monitoring piles are vertically installed and fixed on the piles on the ground. According to the fortification level IV warning water level line of the flood monitoring piles, the distance between the bottom of the flood monitoring pile shell and the ground is reasonably determined. . A large number of flood monitoring piles are arranged along the river channels of Shanhonggou, in front of reservoirs, ponds and dams, and in populated areas vulnerable to flood threats, industrial and mining enterprises, schools, villages, and low-lying places in cities and towns. If necessary, protective fence...
Embodiment 2
[0068] Example 2: Example of Simple Urban Flood and Waterlogging Disaster Monitoring and Early Warning Example
[0069] Due to global climate change, the frequency of severe rainstorms is increasing, causing frequent flood disasters. It is necessary to establish a monitoring and early warning system for urban flood and waterlogging disasters. In the technical solution of this embodiment, the monitoring areas in cities and towns prone to flood and waterlogging disasters are selected, and the layout of flood monitoring piles is reasonably planned.
[0070] Choose to install the flood monitoring pile vertically under the urban road surface, at the side wall of the rainwater well body in the drainage system, and use it to monitor the water level depth in the rainwater wellhead in the drainage system. Since the flood monitoring piles are arranged below the road surface, the micro-power wireless communication module here chooses a 433MHZ wireless module with strong radio frequency p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com