Bucket descending blasting demolition construction method for flip bucket
A construction method and nose sill technology, which is applied in the field of blasting and demolition of the nose sill and sill lowering, can solve the problems of long construction period and difficulty in meeting the project construction period requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0056] Embodiments of the present invention will be described in detail below.
[0057] Construction method of the present invention specifically comprises the following steps:
[0058] (1) The open channel water at the outlet of the diversion tunnel is emptied
[0059] Stop the diversion tunnel before construction, empty the accumulated water in the open channel to below the demolition elevation, and use self-flow, pre-embedded drainage pipes and water pumps to drain the accumulated water in the diversion tunnel after the water level of the Centian River Reservoir drops to EL247m. The drainage time is controlled within 36 hours, and the accumulated water above the EL230 elevation in the diversion tunnel is drained by gravity, and the water below the EL230 is drained by pre-embedded drainage pipes and water pumps. According to the calculation of the construction drawings, the water storage below the diversion tunnel EL230 is about 22,900 m 3 . The above-mentioned EL247m mea...