A construction method of sponge city ecological infiltration ground
A technology of sponge city and construction method, which is applied in the direction of architecture, pavement details, on-site paved condensate pavement, etc., can solve the problems of disrupting the normal circulation of water resources, increasing the urban heat island effect, urban noise, and deteriorating urban ecology, etc., to achieve improvement Water storage performance and pollutant purification ability, increased porosity and rainwater permeability, good repeatability and reproducibility effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] A method for constructing the ecological infiltration ground of a sponge city, such as figure 1 As shown, the sponge city ecological infiltration ground is composed of subbase, base, percolation layer, and permeable ground, and the construction method includes the following steps:
[0020] 1) Preparation of percolation material
[0021] The percolation material is made by combining natural materials, waste materials and artificial materials, among which the natural materials are natural sand, zeolite, quartz sand, wood, meadow soil or sandy soil, and the waste materials are coal ash, crab shell or solid waste The artificial material is fiber membrane, activated carbon or zero-valent iron. According to the percolation effect and economic efficiency, the ratio of natural materials, waste materials and artificial materials is 7:2:1;
[0022] 2) Lay the subbase and base
[0023] Excavate the subgrade according to the design requirements, clean up the earthwork, check the ...
Embodiment 2
[0030] A method for constructing the ecological percolation ground of a sponge city, the ecological percolation ground of the sponge city is composed of a subbase, a base, a percolation layer, and a water-permeable ground, and the construction method embodiment 1 is basically the same, the difference is that:
[0031] In step 1), the proportion of natural materials in the percolation material of the percolation layer is appropriately increased, and the material ratio of natural materials, waste materials and artificial materials is 7:1:0.5.
[0032] In step 2), the laying thickness and compaction coefficient of the subbase and the base can be properly reduced according to the actual situation. According to the requirements of the design, excavate the roadbed, clear the earthwork, lay a 15cm thick lime fly ash stabilized soil subbase layer above the excavated roadbed, and then lay a 10cm base layer after paving and compacting, using cement fly ash to stabilize, The paving is co...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com