Inverted-triangle-based mixed shift arrangement system and method for flexible service system
An inverted triangle and flexible technology, applied in the direction of instruments, data processing applications, office automation, etc., can solve problems that cannot meet the actual needs of the window service industry
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0139] Embodiment one: see Figure 1 to Figure 3 , a mixed shift scheduling method based on the inverted triangle flexible service working system, including the following steps: predict the number of windows that will be opened in the next working time period based on the historical business data of the same period, and the minimum number of windows that will be opened in the next working time period is given by the following formula inferred:
[0140]
[0141] Among them, W q Indicates the average waiting time of customers; c indicates the minimum number of windows required to be opened in the service hall; Indicates the service intensity; λ indicates the average number of customers arriving at the service hall per hour; μ indicates the average number of customers that can be served per window per hour;
[0142] t 0 Indicates the upper limit of the average waiting time that customers can tolerate. For formula (1), the calculation steps are as follows:
[0143] Step 1:...
Embodiment 2
[0201] Embodiment 2: A mixed shift scheduling system based on the inverted triangle flexible service working system, which mainly includes a historical period data management module, a window number generation module, and a new shift scheduling module.
[0202] The historical contemporaneous data management module is used to record and manage historical data:
[0203] The window number generation module predicts the number of windows to be opened in the next working time period according to the historical business data of the same period.
[0204] Extract various historical data of the service hall window (the time when the customer arrives at the service hall, the time for waiting for the service, the time for leaving the service hall after completing the work, and the average time for the window staff to handle the business), apply time series analysis, and predict a certain period of time in the future The number of windows opened is calculated by using the theory of queuin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com