High dam bank slope safety protection facility layout construction method
A construction method and safety protection technology, applied in the direction of coastline protection, etc., can solve problems such as insufficient reliability and not necessarily rigorous methods, and achieve the effect of simple protection facilities, low cost, and obvious economic benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] Referring to the accompanying drawings, a construction method for the arrangement of safety protection facilities on a high dam slope includes the following construction steps:
[0041] a. Measure before the start of the project to determine the position of the apex of the bank slope excavation and the position of the dam crest;
[0042] b. Set up ballast retaining wall and excavate rockfall ditch
[0043] 1) Set up a concrete ballast retaining wall 1 at 2~2.5m above the excavation apex of the bank slope;
[0044] The ballast retaining wall is located at 2~2.5m above the apex, above the foundation groove of the bank slope. Intercept, will not roll into the dam construction area, install anchor rods at the bottom of the ballast retaining wall, go deep into the bedrock, the bottom width of the ballast retaining wall is 0.8m, the top width is 0.3m, and the height is 1.5m. The concrete strength is C25, and the bottom is located on the bedrock The specific construction pro...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap