Method for determining blasting demolition order of deep foundation pit support beams

A technology for dismantling sequence and deep foundation pits, applied in excavation, infrastructure engineering, special data processing applications, etc., can solve problems such as life hazards for construction workers, tensile damage of support beams, accidents caused, etc., to eliminate safety hazards and create creative Strong and safe effect
CN106055801AInactive Publication Date: 2016-10-26WUHAN UNIV OF SCI & TECH

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
WUHAN UNIV OF SCI & TECH
Publication Date
2016-10-26
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention relates to a method for determining a blasting demolition order of deep foundation pit support beams. According to the technical scheme, the method comprises the steps of partitioning the deep foundation pit support beams, building a deep foundation pit support beam finite element model, determining an area with the maximum average pressure value on the deep foundation pit support beams to be the finally demolished area N<M> and determining front-section ultimate compressive bearing capacity N<pressure> and front-section ultimate tensile bearing capacity N<tension> of the deep foundation pit support beams; eliminating the firstly demolished preliminary demolition scheme conforming to the condition according to the maximum displacement U of the deep foundation pit support beams, the maximal pressure f<pressure> of the deep foundation pit support beams and the maximum tension value f<tension> of the deep foundation pit support beams and employing the minimum value of the maximum displacement U of the deep foundation pit support beams as the firstly demolished preliminary demolition scheme; in a similar way, obtaining a second demolition scheme area, a third demolition scheme and a fourth demolition scheme; and finally determining the local demolition order of the areas. The method can meet the actual bearing requirements; the safety of constructors and surrounding buildings and structures can be ensured; the method conforms to the blasting construction characteristics; and the operability is high.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the technical field of blasting demolition of support beams. In particular, it relates to a method for determining the blasting demolition sequence of support beams in deep foundation pits. Background technique

[0002] With the development of urban construction, domestic high-rise buildings are increasing day by day, and correspondingly, large-scale deep foundation pit supporting beam demolition projects have also increased in large numbers, making the deep foundation pit supporting beam demolition technology widely concerned. The blasting demolition method is widely used in China because of its high efficiency, short construction period and moderate cost for demolishing support beams in deep foundation pits. For the blasting demolition of large deep foundation pit supports, the safety of blasting demolition mainly considers two aspects: one is the impact of blasting on the stability of deep foundation pits, and the other is ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More