A workover and oilfield technology, applied in the field of chemical plugging agents for oilfield workover, can solve the problems of short plugging validity period, low plugging strength, and low pressure resistance level, and achieve long plugging validity period, large plugging radius, The effect of high compressive strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] Well H5-152 in Huzhuangji, Zhongyuan Oilfield, the well S 3 middle 2 , 1961.2-1972.3 meters, 5.5 meters / 3 layers, severe water flooding, according to the adjustment requirements of the well group to implement plugging of this layer. The on-site plugging agents are as follows by mass percentage: 65% superfine cement, 8% bentonite, 8% calcium oxide, 12% calcium carbonate, 5% asbestos wool, 0.5% carboxymethyl cellulose, 0.5% polynaphthalenesulfonic acid, Sulfomethyl tannin 1% solid phase mixing and stirring evenly. During construction, mix it with water at a ratio of 1:1.5 to make mortar, and inject it into the layer to be plugged. The treatment radius is 2.5m, and after 36 hours of curing, the drilling plug is tested to be qualified at 30MPa.
Embodiment 2
[0021] Well H96 in Huzhuangji, Zhongyuan Oilfield, the well S 3 middle 8 , 2306.5-2362.3 meters, 12 meters / 6 layers, severe water flooding, according to the adjustment requirements of the well group, the blockage will be implemented in this layer. The on-site plugging agents are as follows by mass percentage: ultrafine cement 70%, bentonite 6%, calcium oxide 6%, calcium carbonate 10%, asbestos wool 6%, carboxymethyl hydroxyethyl cellulose 0.7%, sulfonated melamine 0.7% resin and 0.6% sodium tannate are mixed and stirred evenly in solid phase. During construction, mix it with water at a ratio of 1:1.5 to make mortar, and inject it into the layer to be plugged. The treatment radius is 2.8m, and after 36 hours of curing, the drilling plug is tested to be qualified at 30MPa.
Embodiment 3
[0023] Well Qingzuji Q21-3 in Zhongyuan Oilfield, this well is a water well, and the water absorption profile shows that S 3 Down 4 , 1865.2-1902.3 m, 6.5 m / 2 layers, 100% water absorption, in order to improve the degree of production of other layers, it was decided to plug S 3 Down 4 . The on-site plugging agent by mass percentage is: 80% superfine cement, 3% bentonite, 4% calcium oxide, 6% calcium carbonate, 5% asbestos wool, 0.5% carboxymethyl cellulose, 0.5% sulfonated melamine resin , Sodium tannate 1% solid phase mixing and stirring evenly. During construction, mix it with water at a ratio of 1:1.5 to make mortar, and inject it into the layer to be plugged. The treatment radius is 3.8m, and after 36 hours of curing, the drilling plug is tested to be 35MPa qualified.
[0024] See Table 1 for the proportions of Embodiment 4 to Embodiment 8 and their performance evaluation indexes.
[0025] The proportioning of table 1 embodiment 4 to embodiment 8 and performance eval...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle size (mesh) | aaaaa | aaaaa |
| compressive strength | aaaaa | aaaaa |