Design method for sectional reinforcement area of reinforced concrete lining of tunnel
A technology of reinforced concrete and cross-sectional area, which is applied in the direction of tunnel lining, tunnel, shaft lining, etc., can solve the problems of cumbersome calculation process, achieve the effect of simplifying the design calculation process and improving design efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0010] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0011] The present invention relates to a method for designing the steel bar area of a reinforced concrete lining section of a tunnel. When the eccentricity of the lining section is greater than 0.55 times the effective section height, the maximum crack width limit ω max as a known parameter, and then calculated according to different situations, so that the lining section meets the maximum crack width limit ω max The required cross-sectional area of longitudinal reinforcement in the tension zone A s .
[0012] refer to figure 1 , a method for designing the reinforcement area of a reinforced concrete lining section of a tunnel, which is carried out in the following steps:
[0013] ① Determine the basic calculation parameters, the basic calculation data include structural calculation internal force, structural size, physical and mechanical param...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com