A posture review method of shield machine used in tunnel construction
A posture review and tunnel construction technology, applied in tunnels, constraint-based CAD, earthwork drilling, etc., can solve the problems of high cost, long measurement and calculation time, low accuracy, etc., and achieve the effect of cost saving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] The tunnel axis is designed by the Design Institute in the city’s three-dimensional coordinate system (absolute coordinate system). To obtain the error during the tunneling process of the shield machine, the coordinate position and azimuth of the shield machine in the absolute coordinate system must be obtained through measurement and calculation. . Specifically, it is to obtain the center of the incision of the shield machine and the coordinate position of the center of the incision in the three-dimensional coordinate system of the tunnel and the azimuth of the axis of the shield machine. The direction is compared to obtain the position deviation value and the angle deviation value. The present invention is based on the stability of the space triangle, and the AutoCAD drawing and space transformation functions to realize the switching of the coordinate system and to check the attitude of the shield machine. The following takes a set of actual data as an example to illu...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


